Dereham Roofing Specialists
01362 702206 Get a Quote →

Exterior Cladding in Bawdeswell

Dereham Roofers installs exterior cladding for homeowners in Bawdeswell and the villages nearby, protecting and transforming walls with systems chosen to suit your home and your budget.

Exterior Cladding · Bawdeswell

Expert Exterior Cladding
in Bawdeswell

What Exterior Cladding Does

Exterior cladding fits over your existing wall surface - whether that is brick, block, render or timber - and gives it a fresh, weatherproof skin. It stops wind-driven rain reaching the structure, reduces maintenance and can significantly improve how the outside of a property looks. A well-chosen and well-fitted system will outlast paint by a considerable margin and requires far less upkeep than render.

Cladding is used on gable ends, rear extensions, garages, full house elevations and anywhere the existing finish has deteriorated or is simply no longer practical to maintain. It is a practical investment in the building, not just a cosmetic one.

Materials Available

The material you choose has the biggest single effect on cost, appearance and long-term maintenance. These are the main options fitted to Norfolk homes:

  • uPVC cladding - the most affordable and most popular. It does not need painting, does not rot and cleans easily. Modern profiles come in woodgrain and solid colours that look considerably better than early uPVC products.
  • Composite cladding - wood fibre and plastic combined. Better natural appearance than plain uPVC and resistant to moisture. Costs more per board but is highly durable.
  • Timber cladding - species such as western red cedar and larch perform best outdoors. Genuine timber requires periodic oiling or painting to stay in good condition. It is the highest-maintenance option but suits certain property styles well.
  • Fibre cement boards - heavier and harder than uPVC, resistant to fire and impact. Available in profiles that mimic timber planks, slate or stone. Labour costs are higher because the boards are more demanding to handle and cut.

What Does Exterior Cladding Cost? Typical Prices for Bawdeswell Homeowners

Cladding costs vary significantly depending on material, area covered, access requirements and wall condition. Below are honest typical ranges to help you budget. These are not fixed prices - every job is different - but they reflect what homeowners across this part of Norfolk are likely to pay.

Material Costs

uPVC cladding boards typically cost £8-£18 per square metre for materials alone, depending on profile depth and colour. Composite boards sit in the £20-£45 per square metre range. Timber (cedar or larch) runs from around £25-£60 per square metre depending on grade and thickness. Fibre cement boards are typically £15-£35 per square metre but carry higher labour costs.

These figures are for the boarding itself. You also need battens, a breather membrane, fixings and trims - add roughly 20-30% to the board cost to cover these components.

Labour Costs

Labour for cladding installation typically runs at £25-£45 per square metre, though this depends heavily on the complexity of the elevation - how many windows and doors break up the run, whether corners are internal or external, and what access is needed.

A straightforward single-storey garage or extension at ground level is at the lower end. A two-storey gable with multiple window reveals and junction details will be at the higher end. Fibre cement boards take longer to fit than uPVC, so labour is usually priced higher for that material.

Typical Job Costs: Example Sizes

  • Garage or outbuilding (one elevation, approx. 15 sq m) - roughly £800-£1,400 all-in for uPVC, including battening and trims, at ground level with no scaffolding required.
  • Rear extension gable (approx. 20-30 sq m) - typically £1,200-£2,400 for uPVC or composite, depending on height and detail.
  • Full two-storey house, one elevation (approx. 50-70 sq m) - expect £3,500-£7,000 or more depending on material, wall condition and access.
  • Full house re-clad, all elevations - costs vary widely but £8,000-£20,000 is a realistic range for an average semi-detached or detached property using composite or fibre cement.

These figures are indicative. A detailed quote from an installer who has seen the job is the only reliable number.

What Pushes the Cost Up

Several factors can increase the final price beyond a basic estimate. Knowing these in advance helps you plan and avoid surprises.

Wall condition. If the existing surface is damp, has cracked render that needs removing, or has areas of spalled or loose brickwork, these need to be put right before cladding goes on. Skipping this step leads to problems behind the boards later. Remedial work is charged separately and can add hundreds of pounds to the overall cost depending on extent.

Scaffolding. For any elevation above ground-floor level, proper scaffolding is required for safe working. Scaffolding for a standard two-storey house typically costs £600-£1,200 and is sometimes arranged separately from the cladding work itself. On a full re-clad, it is often the second biggest cost after materials.

Removing old cladding or render. If the existing surface needs stripping first, that adds labour time and disposal costs. Skipping removal and cladding over the top is only an option if the existing surface is structurally sound and dry.

Complex elevations. Lots of windows, doors, bay windows, pipes breaking through the wall, awkward corners or decorative features all slow the job down. The more detail there is in the elevation, the more time the trims and junctions take.

Material choice. Switching from uPVC to composite or fibre cement typically adds £15-£30 per square metre to the material cost and increases labour time. If budget is the priority, uPVC delivers the best value. If appearance or durability is the priority, composite or fibre cement is worth the extra.

Access difficulties. A house set back from the road with a narrow side passage, or a property where scaffolding poles cannot be set at standard positions, will take longer to rig and cost more in access. Overhead cables or neighbouring boundaries can also complicate things.

What Pushes the Cost Down

There are also factors that can keep a job at the lower end of the range.

  • Ground-floor work only, where no scaffolding is needed.
  • A single, uninterrupted elevation with few or no windows.
  • uPVC material, which is faster to fit and cheaper to buy than composite or fibre cement.
  • A wall in good condition that needs no remedial work before installation begins.
  • Combining the cladding with other work - soffit and fascia replacement, for example - where access costs can be shared across jobs.

Getting a Quote: What to Ask

A quote for exterior cladding should break down materials and labour separately. This matters because it lets you compare quotes properly - one installer may use a cheaper board specification to bring the headline figure down. Ask specifically:

  • Is a breather membrane included, and what type?
  • Are battens, fixings, trims and corner pieces all included?
  • Is scaffolding included, and for how many days?
  • What happens if damp or damaged render is found once the job starts?
  • What is the lead time on materials?

A quote that answers these questions clearly is a good sign. A quote that is significantly cheaper than others without explanation should prompt questions about what has been left out.

Planning Permission

In most cases, fitting cladding to a house is covered under permitted development and does not require planning permission. The main exceptions are listed buildings and properties in conservation areas, where any change to the external appearance usually requires consent. If the property is in one of these categories, check with the local planning authority before any work begins. A responsible installer will raise this with you at the quoting stage.

How Long Does Cladding Last?

uPVC cladding, when properly installed, can perform well for several decades without significant maintenance. Composite boards are similarly long-lasting. Manufacturer finishes on fibre cement boards are typically rated for 10-15 years before re-coating is likely to be needed. Timber is the most variable - well-maintained cedar or larch can last 20-30 years; neglected timber can begin to deteriorate in less than ten.

The quality of installation matters as much as the material itself. A correctly fitted ventilated cavity behind the boards, with properly lapped membrane and sealed junctions, protects both the cladding and the wall behind it for the long term.

Useful Information Before You Start

It pays to do a little groundwork before inviting quotes. Measure the approximate area to be clad - length times height for each elevation, minus obvious openings. This gives installers a starting point and makes it easier to compare quotes. Take photographs of any areas of concern: cracked render, damp patches, areas where old cladding has lifted or paint has failed. This helps an installer identify whether remedial work is likely.

Think about which material finish suits the property. uPVC in a woodgrain finish tends to look more at home on a traditional cottage than a flat white board. Composite in a darker tone can suit a modern extension. Getting samples is always worth doing before committing.

Exterior Cladding Near Bawdeswell

Dereham Roofers covers Bawdeswell and the nearby area, including Dereham, North Elmham, Beetley, Wendling, Fakenham and surrounding villages. If you want a straightforward assessment and a priced quote for cladding your home, call us to arrange a visit.

Why choose Dereham Roofers?

  • Free survey and itemised quote
  • Fixed price - no surprises
  • Fully insured, local team

Get your free quote

No obligation · We usually respond within 2 hours

By submitting you agree to being contacted about your enquiry. No spam, ever.

Emergency roof repair?

Storm damage, active leak, damaged ridge - we aim to be on-site within 24 hours.

Call now: 01362 702206