Dereham Roofers fits exterior cladding systems across Necton and the surrounding area, helping homeowners choose the right material for their property and budget.
Exterior cladding is a new surface layer fixed over the existing outer walls of your property. It protects the building from weather, covers a wall that has deteriorated or is difficult to maintain, and changes the appearance of the property at the same time. Done properly, it removes the cycle of repainting and patching that many homeowners deal with every few years.
The system works by fixing a framed structure - usually timber or aluminium battens - to the existing wall, then attaching cladding boards or panels to that frame. The gap between the wall and the boards allows air to circulate and moisture to drain away, which keeps the wall behind the cladding dry.
Cladding suits properties where the original finish has failed or is near the end of its useful life, where the look of the building needs updating, or where the homeowner wants a lower-maintenance alternative to painted render or bare masonry. It is one of the more significant improvements you can make to the outside of a house, both in terms of protection and visual impact.
Choosing the right cladding material is where most homeowners need the most help. Each option has real advantages and real drawbacks. Here is an honest account of each.
uPVC (unplasticised polyvinyl chloride) weatherboard is the most widely used cladding material on domestic properties across the UK. Boards are available in a range of profiles - flat, shiplap, featheredge and German smoked oak-effect among others - and come in many colours, though white and cream remain the most popular.
Pros:
Cons:
Timber boarding remains a popular choice where the look of natural materials matters. Western red cedar, Siberian larch and treated softwood are the most common species used for cladding in the UK.
Pros:
Cons:
Aluminium composite panels consist of two thin aluminium sheets bonded to a mineral or polyethylene core. They are rigid, very flat and available in a wide range of factory-applied colours and finishes. They are more common on commercial buildings but are used on contemporary homes where a clean, modern look is wanted.
Pros:
Cons:
Some cladding systems incorporate a layer of rigid insulation between the carrier frame and the boards. This can meaningfully improve the thermal performance of an older solid wall and reduce heat loss. Solid walls - common in properties built before the 1930s - cannot be cavity-filled and are often the worst-performing part of a house's thermal envelope.
If your property has uninsulated solid walls and you are planning to reclad anyway, it is worth asking about insulated systems. The additional cost is real but the improvement in comfort and energy use can be significant. An insulation layer of 50-100mm added behind cladding can bring a solid wall's thermal performance close to modern standards.
Not all properties are suited to this approach - if the wall sits close to a boundary or the added thickness would cause issues around window and door frames, a non-insulated system may be more practical. Ask for both options to be quoted so you can compare.
Whatever material you choose, the quality of the installation matters at least as much as the product itself. A good installation starts with a proper inspection of the existing wall. Any loose render, cracked masonry, failed pointing or active damp should be dealt with before the new system goes on. Fitting cladding over a wet or structurally compromised wall makes the underlying problem harder to find and fix later.
The batten or carrier frame should be fixed securely into the masonry, not just into the render coat. A ventilated cavity of at least 25mm between the back of the boards and the wall face allows moisture to escape rather than accumulate. Boards should be fitted from the bottom upward, with each board overlapping the one below so water sheds away from the wall.
The most critical areas are the junctions around windows and doors. Water that runs down the face of the cladding will track along window sills, find any gap between the cladding edge and the window frame, and get behind the boards. Good practice means fitting purpose-made sill extensions, using quality sealant at all junctions, and ensuring that every opening sheds water away from the reveal rather than into it. Ask to see examples of how any contractor you are considering handles these details.
In most cases, fitting cladding to the outside of a house falls under permitted development and does not require planning permission. However, there are exceptions. If your property is in a conservation area, or if it is a listed building, you will need to check with the relevant planning authority before work starts. Properties in conservation areas often have restrictions on the materials and colours that can be used on the exterior. Your contractor should be aware of this, but it is ultimately the homeowner's responsibility to check planning requirements before instructing work.
Exterior cladding costs vary depending on material, wall condition, access and the amount of preparation needed. As a guide:
A full re-clad of the front and one side elevation of a typical semi-detached house might run from £4,000 to £9,000 depending on the material chosen and the size of the property. These are realistic UK ranges - your actual cost will depend on a proper site visit and inspection of the existing wall. Any quote given without seeing the property should be treated as a rough estimate only.
Scaffolding is usually needed for anything above ground-floor height. Make sure any quote you receive states clearly whether access is included in the price or charged separately. A significant variation in quotes between contractors is often explained by one including scaffolding and another not.
Before you commit to any contractor, it is worth getting clear answers to these:
A contractor who can answer all of these clearly is more likely to produce a result that performs well over the long term.
If you are considering exterior cladding for your property and want an honest conversation about which material suits it best, call us to arrange a site visit and we can give you a clear picture of your options and realistic costs before you decide anything.
No obligation · We usually respond within 2 hours
Storm damage, active leak, damaged ridge - we aim to be on-site within 24 hours.